• FPOM

Petroleum Construction

Aboveground /Underground Tanks

Sales/Installs/Service/Removals

Design/Build Fuel Site

At APL we have it all, consider us your one stop for all your petroleum construction and maintenance needs.

Design Build fuel sites

Above Ground Tank Sales and Installs

Underground Tank Sales and Installs

Aboveground Tank Removals and RAPS

Concrete Aprons and Concrete Dyke Systems

Metal Dykes with Liners Sales and Installation

Consultants and engineers frequently work with APL Environmental Services on projects requiring remedial activities, soil excavation, tank removal, installation/removal of treatment systems or with other related environmental services. APL assists with Design/Build Contractors, General Contractors and Demolition Contractors to focus on environmental concerns during projects.

service-maintenance
Plant
Petroleum Construction
Underground Storage Tank
Gas Station Installation
Trans Station

Design/Build Site Developers Service Options

Tank Cleanings/Removal – (Both above Ground and Underground Tanks)

Waste Management – Many project buildings initially contain miscellaneous chemicals. APL segregates them on-site into groups based upon similar chemical properties, and then packages them into drums for off-site transportation to an approved disposal facility, or to multiple facilities depending on the chemical makeup of the waste stream.

Consolidation/Disposal/Recycling of Universal Waste – The majority of work performed in this space is the consolidation, disposal and/or recycling of universal waste at project facilities.

Universal waste can include items such as :

Mercury Vapor Bulbs

Fluorescent Bulbs

PCB and Non-PCB Light Ballasts

Mercury Containing Thermostats

Lead-Acid Batteries

Lithium Ion Batteries

Various Other Hazardous and Non-hazardous waste material

Flush/Drain/Remove Chemical Waste Pipes or Chemical Pipes No Longer in Service

Wall/Floor Decontamination via Pressure Washers – Prior to Painting or Resurfacing

Brick Wall Demolition – (For Walls with PCB Contamination) – For one such job, APL employed a conveyor system to remove debris from a basement to the first floor. The waste was then transported via Bobcat to outside the building where it was then dumped into roll-off containers.

Emergency Response Service – For example, upon encountering buried tanks or other ground contaminants that need to be legally rectified.

Freon Drain from Facility Chillers and Air Conditioning Units – Prior to Demolition